Great
Hautbois House Development
March 23 2007
The lift has arrived! While the main building work was taking place we also had the lift installed. The money for this was raised by Anglia Trefoil Guild, and through the efforts of everyone this was raised very quickly. Grateful thanks to everyone for all they did, and we are sure that generations of people to come will benefit from this wonderful addition to the House.
 |
The new lift situated in the main stairwell. Being mainly glass it still allows plenty of light in, without looking too obtrusive. |
| Looking into the lift.. |
 |
 |
The control panel. |
| Looking upwards inside the lift. |
 |
 |
Looking down from the first floor landing. . |
Last saved
25 March, 2007